Marshall Paint Factory Renovation Project

COUNTRY
TURKEY
LOCATION
KOCAELİ
SITE AREA
85.000 m2
CONSTRUCTION AREA
16.000 m2
COMPLETION
2014

Raw Material Warehouse, Liquid Material Warehouse, Production Building, Plasticizer Building, Esterification Building, PVA Building, PVA Tank Farm, Raw Material Buffer Warehouse, Raw Material Tank Farm

SERVICES
  • Scope of Design services,

    • Medium Voltage (33kV & 6.3 kV) / LV distribution to facilities and buildings inclusive feeders from TEIAS TM/GIS 154kV/33kV Plant and provisions for future developments.

    • Medium Voltage Power Distribution

    • Transformer Substation

    • Emergency Generator Back-Up system

    • UPS Systems (Uninterrupted Power Supply)

    • MV, LV Short Circuit calculations

    • Power Factor Correction and Harmonic Filtration

    • MCC & Electrical Panel Details

    • Low Voltage Power Distribution (0.4kV Utility, Process&Mechanical Equipment)

    • Grounding System

    • Lightning Protection System

    • Internal and External Lighting

    • Emergency Lighting System

    • Security (CCTV, Card Access Control) Systems

    • Fire Detection and Alarm System

    • Emergency Announcement System

    • ICT-Telecommunications-Data Network System

    • Lighting Automation

    • Cable, Cable Raceway and Busbar Power Distribution

    • Site wide Electrical Site Infrastructure including setting sizing and section requirement for Manholes, Duct banks, Galleries, Utility tunnels, Pipe rack etc.