Kırklareli Combined Power Plant

COUNTRY
TURKEY
LOCATION
KIRKLARELİ
CONSTRUCTION AREA
2525 m2
BOT COMPANY
ALTEK ALARKO
COMPLETION
2002

Annex Building, Steam Turbine Hall, Water Treatment, Associated Auxiliaries, Gate House, Gas Reducing Building

SERVICES
  • Scope of Design services,

    • Medium Voltage (33kV & 6.3 kV) / LV distribution to facilities and buildings inclusive feeders from TEIAS TM/GIS 154kV/33kV Plant and provisions for future developments.

    • Medium Voltage Power Distribution

    • Transformer Substation

    • Emergency Generator Back-Up system

    • UPS Systems (Uninterrupted Power Supply)

    • MV, LV Short Circuit calculations

    • Power Factor Correction and Harmonic Filtration

    • MCC & Electrical Panel Details

    • Low Voltage Power Distribution (0.4kV Utility, Process&Mechanical Equipment)

    • Grounding System

    • Lightning Protection System

    • Internal and External Lighting

    • Emergency Lighting System

    • Security (CCTV, Card Access Control) Systems

    • Fire Detection and Alarm System

    • Emergency Announcement System

    • ICT-Telecommunications-Data Network System

    • Lighting Automation

    • Cable, Cable Raceway and Busbar Power Distribution

    • Site wide Electrical Site Infrastructure including setting sizing and section requirement for Manholes, Duct banks, Galleries, Utility tunnels, Pipe rack etc.