Parsan R&D Building

COUNTRY
TURKEY
LOCATION
KOCAELİ
CONSTRUCTION AREA
2.100 m2
COMPLETION
2018
SERVICES
    • Transformer Substation
    • Emergency Generator Back-Up system

    • UPS Systems (Uninterrupted Power Supply)

    • MV, LV Short Circuit calculations

    • Power Factor Correction and Harmonic Filtration

    • MCC & Electrical Panel Details

    • Low Voltage Power Distribution (0.4kV Utility, Process&Mechanical Equipment)

    • Grounding System

    • Lightning Protection System

    • Internal and External Lighting

    • Emergency Lighting System

    • Security (CCTV, Card Access Control) Systems

    • Fire Detection and Alarm System

    • Emergency Announcement System

    • ICT-Telecommunications-Data Network System

    • Lighting Automation

    • Cable, Cable Raceway and Busbar Power Distribution

    • Site wide Electrical Site Infrastructure including setting sizing and section requirement for Manholes, Duct banks, Galleries, Utility tunnels, Pipe rack etc.