Ataturk Airport New International Terminal & Multi-Storey Car Park Project

COUNTRY
TURKEY
LOCATION
İSTANBUL
CONSTRUCTION AREA
360.000 m2
BOT COMPANY
TAV
ARCHITECTURAL DESIGNER
GMW Partnership
BEGINNING
1997
COMPLETION
2000

New International Passenger Terminal, Apron, Air Traffic Control Tower (ATCT), Ground Access, Car Park, Technical Gallery, Landscaping, Site Wide Utility Design

SERVICES
  • Scope of Electrical Design and Site Support services;

    • Site wide MV (34.5 & 10.5 kV) / LV distribution to facilities and buildings inclusive feeders from TEIAS TM/GIS 154/34.5 kV Plant and provisions for future developments.

    • Medium Voltage Power Distribution

    • Transformers

    • Emergency Generator Back-Up system

    • UPS Systems (Uninterrupted Power Supply)

    • MV, LV Short Circuit calculations

    • Electrical (power distribution, incl. road/tunnel and area Lighting )

    • Power/Generator Plants, external Substations Electrical Design

    • Energy Centers, Trigen/Cogen Plants full Electrical works in coordination with specialists

    • Power to AGL/CCR Substations

    • Security Fence electrical works (Power & Lighting)

    • Power to Fuel Farms, Chambers, Jetty etc.

    • Power to utilities such as Oil Separators, Chambers, Lifting Stations etc.

    • Fire Alarm and Public Address of the Utility Buildings & Tunnels. Connections to Fire Brigade (Op Centers)

    • Low Voltage Power Distribution

    • Electrical Panel Details

    • Grounding system

    • Lightning Protection system

    • Internal and External Lighting Site wide SCADA & PMS including Communication

    • Signalization of the subject roads

    • Site wide Electrical Site Infrastructure including setting sizing and section requirement for Manholes, Duct banks, Galleries, Utility tunnels